šŸŽ‰ Up to 70% Off Selected ItemsShop Sale
HomeStore

Planet P Project - Planet P (LP) (Near Mint (NM or M-))

Product image 1
Product image 2
Product image 3
Product image 4
Product image 5

Planet P Project - Planet P (LP) (Near Mint (NM or M-))

Planet P Project - Planet P (LP) (Near Mint (NM or M-))

Planet P Project -Ā Planet P

Media Condition:
Ā Near Mint (NM or M-)
Sleeve Condition:Ā Near Mint (NM or M-)

Awesome shape. Insert with lyrics.
Ā 

Notes:

"─◁" in runouts denotes a [l313656 pressing. Produced by Peter Hauke for Rockoko Production Inc. Recorded and mixed at Hotline Studios, Frankfurt, Germany. Mastered at Artisan Sound Recorders. ā„—&Ā© 1983 The David Geffen Company

A1. Static 4:04
A2. King For A Day 3:57
A3. I Won't Wake Up 3:46
A4. Top Of The World 4:34
A5. Armageddon 4:20
B1. Why Me? 4:06
B2. Power Tools 3:59
B3. Send It In A Letter 3:52
B4. Adam And Eve 3:36
B5. Only You And Me 3:22

Ā 

Barcode and Other Identifiers:

Barcode 0 7599-24000-1
Barcode 075992400015
Matrix / Runout GHS-1-4000-SH3 #2 SLM ā–³ 3684 1-3
Matrix / Runout GHS-2-4000-SH2 SLM ā–³ 3684-X 1-2
Matrix / Runout ─◁ [Artisan logo] GF

Art Direction - Richard Seireeni
Artwork By [Cover Graphics] - George Snow
Drums, Percussion - Fritz Matzka
Drums, Percussion - Hartmut Pfannmüller
Engineer - Jon Caffery
Engineer - Nigel Jopson
Engineer [Assistant] - Carmine Di
Engineer [Assistant] - Mathias Dietrich
Engineer, Mixed By [Mixing Engineer] - Andy Lunn
Guitar - Helmut Bibl
Guitar - Johan Daansen
Guitar - Robert Musenbichler
Lyrics By, Music By, Lead Vocals, Backing Vocals, Keyboards, Bass, Acoustic Guitar, Drum Programming [Roland Rhythm Composer Programs], Arranged By - Tony Carey
Mastered By - Greg Fulginiti
Other [Legal Counsel], Coordinator [Album Coordinator] - Steve Mangel
Producer, Drums, Percussion - Peter Hauke

Mastered At Artisan Sound Recorders
Recorded At Hotline Studios
Mixed At Hotline Studios
Pressed By Capitol Records Pressing Plant, Winchester


Weight:Ā 230

*The images in this post has been importedĀ from Discogs database and may not represent the exactĀ condition of the product.
However, we assure you that the condition of the product is true to the description.
Please contact us if you want us to send you pictures of the product.
At Lulo Records we care about your choice!

Ā 

Data provided by Discogs
$3.50

Original: $10.00

-65%
Planet P Project - Planet P (LP) (Near Mint (NM or M-))—

$10.00

$3.50

Product Information

Shipping & Returns

Description

Planet P Project -Ā Planet P

Media Condition:
Ā Near Mint (NM or M-)
Sleeve Condition:Ā Near Mint (NM or M-)

Awesome shape. Insert with lyrics.
Ā 

Notes:

"─◁" in runouts denotes a [l313656 pressing. Produced by Peter Hauke for Rockoko Production Inc. Recorded and mixed at Hotline Studios, Frankfurt, Germany. Mastered at Artisan Sound Recorders. ā„—&Ā© 1983 The David Geffen Company

A1. Static 4:04
A2. King For A Day 3:57
A3. I Won't Wake Up 3:46
A4. Top Of The World 4:34
A5. Armageddon 4:20
B1. Why Me? 4:06
B2. Power Tools 3:59
B3. Send It In A Letter 3:52
B4. Adam And Eve 3:36
B5. Only You And Me 3:22

Ā 

Barcode and Other Identifiers:

Barcode 0 7599-24000-1
Barcode 075992400015
Matrix / Runout GHS-1-4000-SH3 #2 SLM ā–³ 3684 1-3
Matrix / Runout GHS-2-4000-SH2 SLM ā–³ 3684-X 1-2
Matrix / Runout ─◁ [Artisan logo] GF

Art Direction - Richard Seireeni
Artwork By [Cover Graphics] - George Snow
Drums, Percussion - Fritz Matzka
Drums, Percussion - Hartmut Pfannmüller
Engineer - Jon Caffery
Engineer - Nigel Jopson
Engineer [Assistant] - Carmine Di
Engineer [Assistant] - Mathias Dietrich
Engineer, Mixed By [Mixing Engineer] - Andy Lunn
Guitar - Helmut Bibl
Guitar - Johan Daansen
Guitar - Robert Musenbichler
Lyrics By, Music By, Lead Vocals, Backing Vocals, Keyboards, Bass, Acoustic Guitar, Drum Programming [Roland Rhythm Composer Programs], Arranged By - Tony Carey
Mastered By - Greg Fulginiti
Other [Legal Counsel], Coordinator [Album Coordinator] - Steve Mangel
Producer, Drums, Percussion - Peter Hauke

Mastered At Artisan Sound Recorders
Recorded At Hotline Studios
Mixed At Hotline Studios
Pressed By Capitol Records Pressing Plant, Winchester


Weight:Ā 230

*The images in this post has been importedĀ from Discogs database and may not represent the exactĀ condition of the product.
However, we assure you that the condition of the product is true to the description.
Please contact us if you want us to send you pictures of the product.
At Lulo Records we care about your choice!

Ā 

Data provided by Discogs